Project Details

Conservation and consolidation of Grade 1 listed walled garden. The wall itself was over 450m in length and between 3 and 4m high. The elevations were all recorded and dismantled. Stones were repaired in situ. New stones were fitted where needed. Copings to the wall were removed and re-bedded using a combination of new and reused stones. Cement pointing to over 800 sqm was removed and replaced with lime mortar. The replacement stones were axe faced to match the existing tooling.

Contract Period: 14 months

Contract Value: £540K

Contract Admin: Rhys Brookes, Harrison Brookes Architects